View Cart  |  Sitemap
+86-311-8502 6467sales@gsslurrypump.com
Home>>News

Tel: +86-311-8502 6467

Fax: +86-311-8305 0889

E-mail: sales@gsslurrypump.com

Before series slurry pump working,the examination steps we should do(2)

Before series Slurry Pump working, we should make a thorough examination, make sure it can work normally. Today we will continue to introduce these steps.

5. DC driving, AH slurry pump shaft and motor shaft should centered precisely; Belt driving, pump shaft and motor shaft should parallel; and adjust the slot wheel position to make it vertical with belt, to avoid cased severe vibration and abrasion.

6. On the pump suction pipe, we should install a removable short tube. The length should be enough to disassemble the pump cover and replace parts, so it is easy to pump maintenance.

ZJ Slurry Pump    

7. Check the shaft sealing: 

Adjust stuffing box gland and tighten the screw, to adjust the tightness of packing and the shaft sealing water.

8. Adjust the pre-tightening force of triangle belt.

After finished v-belt adjustment, recheck whether the impeller rotation is normal.

After those steps, we can start the AH slurry pump working, if you have any questions, please feel free to contact us: Sales@gsslurrypump.com.


>>Previous: Looking for Slurry Pump Agent or Distributor in Worldwide

>>Next: The examination step before MH series Slurry Pump working(1)

We love to hear about you and are happy to answer any questions!

Your E-mail: *
Your Name: *
Your Country:
Contact Tel:
Application:
Detailed Message :
CAPTCHA:

Home | Products | Project | About Us | Service | News | Contact Us

Tel:+86-311-8502 6467Fax:+86-311-8305 0889 E-mail:sales@gsslurrypump.com E-mail:sales1@gsslurrypump.com

Copyright © Shijiazhuang Gravel Slurry Pump Industry Co.,Ltd. All Rights ReservedTechnical Support: Reanod